Design and production of two Cogeneration Systems.

Acerra - NA ()

Design and production of two Cogeneration Systems for two civil and industrial wastewater treatment plants.

- Installation, technical supervision of the assembly, start-up and test run of 2 Cogenerations of 375 kWE each, fueled by natural gas and biogas, including dehumidification system, ATEX blowers and double gas ramp.
- Technical supervision of the assembly, start-up and test run of 2 Cogenerations of 851 kWE each, fueled by biogas and natural gas, including a double gas / biogas ramp and an LV / MT electric transformation cabin (400V / 6 kV).